The mechanical subteam continued to inventory their materials including gears, sprockets, bearings, collars, and shaft couplings. They also milled holes on the practice robot frame. The electrical subteam color coded the gyro documentation for the eclipse code, worked on the three autonomous plans. The systems subteam worked on determining the gear ratios needed to lift two totes, tested the arms acceleration, and began working on the gearbox design.