Today the mechanical subteam looked for 2” by 1” aluminum rectangular tubing, cleaned the 4-bar pieces, and looked for wheel mounts. The electrical subteam researched how to use the accelerometer, tested for the accelerometer, tested and updated the camera code, and made wiring diagrams of current electrical components. The systems subteam made the mechanical drawings for the cuts needed and gave them to the mechanical subteam.