The electrical team began to set up two batteries and attached a wires to the batteries and continued to work on the camera code. Meanwhile, the mechanical team continued to wet sand and polish. While some sanded, others drilled shoot holes and laid out the angles so that the mill could be used to drill holes in the angles. After this was done, the team set to work tack welding the frame.